OTAVA® DRaaS powered by Zerto: code version upgrade, Austin (SC1) and Las Vegas (W1) - 6/4/26

Scheduled Maintenance Report for Otava Status Page

Completed

The scheduled maintenance has been completed.
Posted Jun 04, 2026 - 15:00 EDT

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jun 04, 2026 - 09:00 EDT

Scheduled

OTAVA® DRaaS powered by Zerto: code version upgrade, Austin (SC1) and Las Vegas (W1) - 6/4/26

Start Time: 6/4/26 - 9:00 AM ET

End Time: 6/4/26 - 3:00 PM ET

Type: Code Upgrade

Service Impacting: Yes. Failover to the site being upgraded will be unavailable for the duration of the maintenance window.

Description: OTAVA Engineers will be performing code version upgrades to our DRaaS powered by Zerto infrastructure in Austin (SC1) and Las Vegas (W1).

If you have any questions or concerns regarding this maintenance, please contact us by logging into https://support.otava.com or calling 877-740-5028, option 3.
Posted May 27, 2026 - 12:20 EDT
This scheduled maintenance affected: AU1 - Austin, TX (DRaaS powered by Zerto) and NV1 - Las Vegas, NV (DRaaS powered by Zerto).