Scheduled maintenance is in progress. Please note that the maintenance window has been extended until 6:00PM ET due to the newfound installation time required.
Posted Jun 03, 2026 - 12:44 EDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jun 03, 2026 - 09:00 EDT
Scheduled
OTAVA® DRaaS powered by Zerto: code version upgrade, Indianapolis (NC1) and Mid-Michigan (NC2) - 6/3/26
Start Time: 6/3/26 - 9:00 AM ET
End Time: 6/3/26 - 6:00 PM ET
Type: Code Upgrade
Service Impacting: Yes. Failover to the site being upgraded will be unavailable for the duration of the maintenance window.
Description: OTAVA Engineers will be performing code version upgrades to our DRaaS powered by Zerto infrastructure in Indianapolis (NC1) and Mid-Michigan (NC2), including pClouds in these sites.
If you have any questions or concerns regarding this maintenance, please contact us by logging into https://support.otava.com or calling 877-740-5028, option 3.
Posted May 27, 2026 - 12:18 EDT
This scheduled maintenance affected: MM1 - Flint, MI (Mid-Michigan) (DRaaS powered by Zerto) and IN1 - Indianapolis, IN (DRaaS powered by Zerto).